SHAWN SINCAVAGE
600 Briarcliff Rd.
Eustis Fl,32726
407-592-6905
PROFESSIONAL EXPERIENCE
P Westower Communications
roject Manager 9-12 to Present (Projects listed below)
Sprint IDEN / Sprint Vision, Orlando Market
• Staffing arrangement with Ericsson/Sprint; reported to and interfaced directly with the client
• Managed the site construction process from construction start to completion
• Set up bid walks and submit pricing on behalf of Westower Communications
• Responsible for preparing B.O.M’s and ordering materials (tower and civil)
• Inspect and verify the work performed is in compliance with site specifications and construction
drawings
• Field supervision and management of In house and subcontractor crew
• Reviewed In house and subcontractor s close-out documents
• Performed site punch-walks
P Mann’s Tower Services
roject Manager Feb. 9-5-11 to 9-12 (Projects listed below)
AT&T 4G LTE Project, OH/PA/KC/MI Markets
· staffing arrangement with AT&T; reported to and interfaced directly with the client
· managed the site construction process from construction start to completion
· Responsible for daily updates and daily conference calls
· Responsible for ordering material (tower and civil)
· Inspect and verify the work performed is in compliance with site specifications and construction
drawings
· Field supervision and management of in house and subcontractors
· Completed and uploaded closeout docs into Quick Base and Site Siterra
· Responsible for creating change orders and submitting to client
P CLS Group
roject Manager 2-9-09 to 9-11 (Projects listed below)
T-Mobile New Build Project, AL/MS Market (Jan 2011 to Present)
• Staffing arrangement with T-Mobile; reported to and interfaced directly with the client
• Managed the site construction process from construction start to completion
• Order power/Telco and schedule walks
• Set up bid walks and review subcontractors bids on behalf of T-Mobile
• Responsible for preparing B.O.M’s and ordering materials (tower and civil)
• Inspect and verify the work performed is in compliance with site specifications and construction
drawings
• Field supervision and management of T-Mobile subcontractors
• Reviewed subcontractor close-out documents
• Performed site punch-walks
Clearwire New Build Project, Cleveland Market (Feb. 2010 to Dec. 2010)
• Managed the site construction process from construction start to completion
• Attended bid walks and made bid pricing recommendations to corporate
• Coordinated material pick-up and verification at Clearwire’s warehouse
• Inspect and verify the work performed is in compliance with site specifications and construction
drawings
• Field supervision and management of 8 tower crews, 5 civil crews, and 3 electrical crews
• Reviewed subcontractor close-out documents and submitted closeout package to client
• Attended site punch-walks with the client and cleared punch items in a timely manner
AT&T New Build Project through Black & Veatch, OH/PA Turf (Feb. 2009 to Jan 2010)
• Responsible for managing the construction of several high-profile sites including rooftop
locations and a difficult Chimney Stealth site that was praised by both AT&T and Black & Veatch
• Managed multiple tower crews, civil crews, electricians, brick masons and other trade specialists
• Inspect and verify the work performed is in compliance with site specifications and construction
drawings
• Assembled JSA’s, Lift Plans, and Safety Deliverables
• Reviewed close-out documents from the crews and packaged for submittal to client.
• Upheld and adhered to the strenuous Safety procedures and deliverables required by Black &
Veatch / AT&T
C McCabe-ORIN
onstruction Manager Feb. 2006 to Dec 2008
AT&T New Build /UMTS Project through Black & Veatch
• Manage the site construction process from construction start to completion
• Order power and schedule walks
• Set up bid walks and review subcontractors bids
• Responsible for ordering material (tower and civil)
• Inspect and verify the work performed is in compliance with site specifications and construction
drawing
• Field supervision and management of in-house and subcontractors
• Assembled and reviewed customers close-out documents
GHA, Inc.
Construction Manager 2003 – 2006
• Responsible for managing in-house and sub crews (Nextel, Cingular and Sprint)
• Managed sites to assure jobs were completed in timely fashion and with quality work
• Bidding process
• Closeout packages to include: Photos, sweep tests, and safety forms
• Bid Walks
• Ordering of material
WIRELESS CONSTRUCTION TRAINING
OSHA 30-Hour
OSHA Tower Safety Conference
Andrew Institute Connector Attachment Training
Comm Scope Institute Connector Attachment Training
Bechtel Tower Safety Training
T-Mobile /Nokia/Siemens /Certification